|
MAJOR CAMP IMPROVEMENTS COMPLETED PROJECTS
Headquarters & Founders Lodge Wifi'd new metal roof on the cpr building new metal roof on the shelter across from staff area new metal roof on the shelter on the shooting sports road improvements to road from campsite 1 to 2 improvements to road between campsites 12 and 13 improvements to road between campsite 11 and cope road improvements to cope road improvements to waterfront road new metal roofs on washstands and kybos in all 14 campsites remodeled male restroom in dining hall remodeled male restroom in headquarters new teaching pavilion for First class trail program new teaching pavilion for Outdoor skills program New storage and teaching pavilion at waterfront new 100 foot water slide with a 40 foot tower new metal roof on directors cabins wireless internet in the Founders Lodge additional lighting at the council ring purchased a sand blaster purchased a pressure washer 18 new picnic tables Although it is not brand new, we recently added a pavilion near handicraft six canoes to go with two new canoes purchased last year $5,000 12 kayaks $4,000 9 hole disc golf course $3,000 Repairs to Shooting Sports and Cope Road $7,500 Air Conditioning/Heating units for two directors cabins $1,400 320 target automatic skeet thrower $2,400 Welding machine with generator $2,800 Hundreds of stumps removed from campsites and program areas "Safe barrier" fence constructed at rifle range New metal roof on the Carr Lodge New Brush Hog purchased two new canoes new jon boat with 25 horsepower motor for motor-boating merit badge 4 large capacity drink dispensers for dining hall 10 new genesis bows 20 new dining flies new metal roof on pool house "safe barrier" fence at shotgun range 10 new tables in dining hall 50 new chairs in dining hall additional bench seating at chapel new covered pavilion at trading post four square court new at trading post Flag Poles at Dining Hall Painted Flag Pole at HQ Painted Crushed limestone spread at Council Ring Council Ring Fence painted and repaired Improvements made to secondary water well West End Women's Shower Facility repaired Floating dock rebuilt - $1,650 Privacy fence in front of dining hall trash trailer Seven new sailboats and off season storage rack - $7,400 190 hp ski boat - $19,000 Finishing mower - $1,500 Welding of existing row boats - $800 Walk in freezer and refrigeration units in dining hall - $27,000 Removal and construction of new boat dock - $28,500 Dining Hall Re-Painted Cooks cabin painted Replaced cope building roof Rifle target stands replaced New archery stands & target butts purchased Row boat racks constructed Picnic tables repaired Replaced sound system at council ring Purchased new bows for archery program Three new Automated External Defibrillators purchased built shooting sports latrine
PROJECTS UNDERWAY
Development of 'Ideal Campsite' plan Tejas Lodge's - Scoutmaster's Lounge Renovation of family camping area Renovations of Carr Lodge
OTHER GWP IMPROVEMENTS
Replaced floor in Cooks cabin painted headquarters, health lodge, archery range, CPR Building, staff shower house, nature building Added benches at chapel Founders Lodge rebuilt walkway between ranges at rifle range electrical overhaul in staff area New entrance gate to camp Upgraded the COPE course Painted most campsite latrines Painted admin., first aid, storage building, pool shower, trading post, and work shop Replaced the septic system for two Director's Cabins, Admin. Building, Nelson building and the Assistant Rangers home with aerobic systems Purchased 40 new camp tents with wood poles and 10 tarps Cut and removed hundreds of dead trees Created a Timber Management Committee New sailboats Replace kitchen ovens ($11,000) 100 new chairs and 20 new tables in dining hall Road and parking lot repairs Replacement of chapel roof New COPE equipment
|
|